real estate developer of missing middle housing in Toronto

DC avoidance - pivot back to triplex + GS strategy for Coxwell

first and second floor complete - Jones

pre slab gravel and insulation - Gerrard LWS

bulkhead framing & drywall - Gerrard

Investigating helical piles + slab for Jones GS - first floor height is 6" above grade

new first floor above old - lvl ledger board connected to existing masonry wall with 3/4" anchor wedge bolts - Jones

spiral stair second egress design - Gerrard

Water line re-run. 2.44m horizontal clearance from sewer line + protective sleeve and tracer wire - Gerrard

Drains - Gerrard

Trench footing poured & ducting commenced - Gerrard

LWS trenching - Gerrard

LWS drain and water connection - Gerrard

LWS utility trench - Gerrard

125a per unit + 100a house meter