DC avoidance - pivot back to triplex + GS strategy for Coxwell
first and second floor complete - Jones




pre slab gravel and insulation - Gerrard LWS


bulkhead framing & drywall - Gerrard



Investigating helical piles + slab for Jones GS - first floor height is 6" above grade
Jones



new first floor above old - lvl ledger board connected to existing masonry wall with 3/4" anchor wedge bolts - Jones



spiral stair second egress design - Gerrard




Water line re-run. 2.44m horizontal clearance from sewer line + protective sleeve and tracer wire - Gerrard



Drains - Gerrard

Trench footing poured & ducting commenced - Gerrard




Jones


LWS trenching - Gerrard








Jones





LWS drain and water connection - Gerrard


LWS utility trench - Gerrard


Gerrard




Jones




125a per unit + 100a house meter