New building code restriction: openings in exterior walls within 3 meters horizontally and less than 5 meters above unenclosed exterior exit stairs or ramps need to be fire protected

Jones GS - Slab poured.. delayed weeks due to low temps

Thanks! You inspired me to finally figure out how to hook it up!

Shower glass & Door hardware - Gerrard

Drywall - Gerrard LWS

Kitchens and Paint - Gerrard

Heat pump installation - Gerrard

Insulation - Gerrard LWS

Duct work - Gerrard LWS

GS Framing progress. Fourplex waterproofing, sump installed, gravel ready for concrete - Jones

Spiral Stair install - 25'9" - 3 landings with outer handrail 1070mm high, clear width between handrails 660mm, risers not more than 240mm, minimum of 190mm deep run at 300 mm from center line of handrail - Gerrard

Stucco in rain - Gerrard LWS

Drains + GS connection - Jones

Decent size footings. Sewer pipe a good 4' down = good slope. Jones

Finish on sides of LWS or GS only component required to be non-combustible

Basement Walkout - Jones