had my lightning node off for about 2 hours (rearranging the server space) and I had two channel partners close on me. It's okay guys, patience! You should give at least 3 days before closing a channel -- or am I wrong?
Discussion
Maybe it was a pending htlc hanging? And the force close was not manually triggered by the channel partner?
in Lightning, collaborative close is pretty fast, 1 o 2 block, force close of a channel takes 144 to 2016 blocks for the Tx to show up in the wallet/node dashboard and confirmation depends on network congestion