Good morning, All! It is overcast in northern Ohio today and we’ve reached our high temperature for the day. (47) Our new furnace is installed with wiring, fuel line, exhaust pipe, and ductwork all connected. All that is left is for the propane & tank to be delivered and connected to the house. That, and line test and final tuning/light-up are scheduled for

this coming Thursday. We are excited! It has been about a month since our wood-fired furnace had its third flue fire and we decided to switch to propane.

Anyway, it is time to put the ducks out and gather eggs. Then I have to carry a cord of firewood up out of the basement. At least I can’t complain about not having anything to do!

Reply to this note

Please Login to reply.

Discussion

Gm☕😊. Congrats on the new furnace.