Been building a 20ft tiny house piece by piece over the last 6 years. It's that time of the year to get back to work on it. Currently finishing the staircase/ladder/closet/storage selves up the loft. Reclaimed rough sawn ash from the neighbors rejects. Tung oil finish.

Reply to this note

Please Login to reply.

Discussion

👀👀 looking dope AF homie

Nice PoW!!

Been plinking away on a 20ft tiny house, today the bathroom and the stairs before that. Got the sink in, trim finished in the shower and doorway, rail for the sliding door. The wall paper is pages cut out of a draft horse book pasted on with several coats of polyurethane, the shower is solid surface from the trash, the trim is reclaimed pine from a friends house stained with iron acetate. Stairs/closet/storage shelves are reclaimed ash(?) Finished with tung oil. Still need to install the hand railing. Fingers crossed I can finish this project up before June.

Awesome project 🤙

Testing out the railing for the stairs up to the loft in this 20ft tiny house I've been working on for the last several years. I typically have 3 months to work on it a few hours a day during the winter. I look forward to hosting many guests, students, apprentices, instructors and family in it here on the homestead once completed.