βΈ»

πŸ› οΈ PHASE 1: SHIELDING THE FUTURE

πŸ“¦ Faracherβ„’ Bunker Build Log

Before we install power, servers, or solar β€” we shield.

βΈ»

πŸ”° PHASE 1 CHECKLIST – CRITICAL MATERIALS

βœ… Copper Mesh Shielding

β€’ 99.9% pure, 1/8” spacing – this is the real Faraday skin.

β€’ Solder or tape all seams. No gaps. No luck. Just continuity.

βœ… Conductive Tape (Copper Foil)

β€’ Not all tape is created equal. Use adhesive-backed copper tape with conductive glue.

β€’ Every joint, corner, vent seam = sealed.

βœ… Grounding Strap (1.5” copper braid)

β€’ Links the entire system to the Earth.

β€’ Crimp, bolt, and use oxidation inhibitor. No floating cages.

βœ… 8’ Copper-Clad Ground Rods (x2)

β€’ Drive deep. Moist soil = better bleed-off.

β€’ Bond rods together, then to your mesh.

βœ… Rubber Floor Mat

β€’ 0.5” non-conductive isolation.

β€’ No adhesive. No grounding through your feet.

βœ… Ferrite Cores (7–13mm)

β€’ Snap on every power + data line crossing the boundary.

β€’ Double loop where possible. Kill the RF bleed.

βœ… (Optional) EMI Honeycomb Vents

β€’ If you need airflow, do it right.

β€’ Waveguide vents, metal-bonded, filtered.

βΈ»

πŸ”Ž DO NOT PROCEED until:

β€’ Continuity tested (0–1Ξ© across shell)

β€’ Grounding confirmed (<25Ξ© to earth)

β€’ RF scan shows full containment

Reply to this note

Please Login to reply.

Discussion

No replies yet.