People think LK-99 is going to take a long time for production to scale up. 👎
I do not share these concerns.
Behold a 48ft vacuum furnace available from US supplier. Furnace capabilities include 200,000 lb load capacity, processing temperatures up to 2650°F, and vacuum levels of 10-5 torr. 🤔
There could easily be 100’s of tons of Lk-99 (or equivalent/superior RTSC) sitting around very quickly. 👍 
