In fact, one of the largest steel producers is already lining up to have a fusion plant built onsite of their manufacturing facility to drop their costs for their electric arc furnaces. Any industry that consumes power en masse is likely to want cheapest power possible. https://nucor.com/news-release/20126

Reply to this note

Please Login to reply.

Discussion

Building a power plant onsite bypasses a lot of the hurdles of cheap power on the grid. How soon till one of the big Bitcoin mining groups or treasuries start investing in building their own power generation to drive down cost of mining?