🛠️ PHASE 2: BONES OF THE BUNKER
📦 Faracher™ Build Log – 6x6x6 EMP Vault
⸻
Before you power anything, you build the shell.
We’re erecting a freestanding steel cube inside a shop — 6 feet on all sides. No attachment to walls. No support from the grid. Just pure containment.
⸻
🔩 STRUCTURE CHECKLIST:
✅ Steel Frame
• 1.5” galvanized square tubing or Unistrut
• Welded or bolted tight. No play. No warping.
• Mounted on rubber isolation pads
✅ Copper Mesh Bonding
• Stapled + taped to all wall surfaces
• Seams sealed with conductive copper tape
• Flanged at corners for full continuity
✅ Faraday Door
• Brush seal or copper-fingered latch
• Mesh flap overlaps + RF gasket
• Hinged + bonded to mesh layer
✅ Ground Bus Bar
• Every wall panel, server rack, and UPS connects to it
• Strap out to ground rods from Phase 1
• Star washers. Labels. Logs. No assumptions.
⸻
⚠️ DON’T MOVE FORWARD UNTIL:
☒ Continuity test passes corner-to-corner
☒ Door seal shows zero light leaks
☒ Bus bar bonded and measured < 25Ω to ground
☒ No RF leakage (run radio sweep or use scanner)
⸻
This is more than framing.
This is a containment skeleton for data, power, memory — and you.
Next: ⚡ Phase 3 – Power and Redundant Solar Node.