Need to dig out the center and 45 for the vent shaft, sand her up, stack rock, then burn some refuse.
Ended up changing location of the fire pit so that it isn’t near the septic drain field. Don’t think I was directly over top of it, but I don’t want to deal with digging it all up and replacing it on the off chance I was too close and it melts the tube shut.




