⚡️ PHASE 3: POWERING THE GHOST

🔋 Faracher™ Bunker Build Log – Redundant Power Core

Before the system thinks, it survives.

In Phase 3, we deploy hardened power for blackout-proof uptime and EMP resistance.

🔧 POWER LAYERS DEPLOYED:

✅ Line-Interactive UPS

• 1000VA+ pure sine wave

• Shields from grid spikes, brownouts, and shutdown lag

✅ LiFePO4 Battery

• 12V or 24V deep-cycle

• 100Ah+ capacity, isolated in grounded steel box

✅ MPPT Solar Controller

• Victron SmartSolar

• Monitors, regulates, and stores charge from solar array

✅ Pure Sine Inverter

• Converts solar battery into clean AC

• Internal mount, filtered + fused

🧷 FAILOVER STRATEGY:

• AC goes down → UPS takes over

• Extended outage → solar loop kicks in

• Critical loads (server, NAS, redundant node) stay alive

• Monitoring via Victron app + physical logs

• Manual kill + bypass switch included

⚠️ MUST-HAVE HARDENING:

☑️ Shielded wiring

☑️ Ferrite cores on every line

☑️ Metal conduit cable runs

☑️ Grounded bus bar

☑️ Surge protection at all in/out junctions

Phase 3 Complete = Silent Power.

Redundant. Shielded. Logged. Alive.

📥 DM “GHOSTPOWER” for the checklist PDF

🛡️ #Faracher #OffGridPower #EMPReady #DigitalFortress #RedTeamReality #SurvivalNode #LowPowerOps

Reply to this note

Please Login to reply.

Discussion

No replies yet.