Just got handed 6MW of power
If you have a data center and asics that need a home I have Sovereign Land to put you on (500kW deployment minimum)
Power at cost 3.5-5.5ยข/kWh based on generation setup(lease or own) with 90/10 split on hashrate.
Hit me up, DMs open. Pls Boost.
