Texas wind, transmission is entirely initiated and perpetuated by subsidies.

Texas grid is downstream of the central planners in DC subsidizing unreliables, and shutting down existing and potential reliable base load energy gen.

Reply to this note

Please Login to reply.

Discussion

No replies yet.