1st Floor System

2nd Floor System

Reply to this note

Please Login to reply.

Discussion

Props for not revealing the secret tunnel and compartments. Good OpSec

Looks much better! No more saggy ceilings. And oh look, there is a stairwell now! Haha

32' spam is 18" truss with stacked chords at 1'oc. Gets the deflection down to .6 in

An actual engineered solution... Which you would think is supposed to be the job of the EOR... But here I am. Not sure wtf they're paying the EOR for.