🚨Ocean Pool Maintenance 🚨

I checked my wallet and hadn’t received any lightning payments

Since May 31. Went to Discord to check for problems and found this. Figured I’m not the only one so though I’d share. GN

———————————-

Start of window: 2025-05-26 12:00 UTC (2025-05-26 8AM ET)

End of window: 2025-06-06 20:00 UTC (2025-06-06 4PM ET)

Window duration: Approximately 11 days

Scope: Core Infrastructure Upgrades

Expected Impact: Minimal: Delayed web/API stats; Network reconvergence; Lightning Payment Delays

Potential Impact: Short client connection losses; fallback block reward handling.

Details: OCEAN and partners will be performing major planned upgrades to core infrastructure at one of our hosting facilities as part of our ongoing efforts to improve reliability and redundancy of our services. During the maintenance window, client traffic may be routed through redundant systems, moved from one system to another, and otherwise routed as required to maintain maximum service availability during this upgrade. While there is no expected impact, there may be brief temporary disruptions to Stratum and/or DATUM miner connections during the maintenance window. These connection drops will be kept to an absolute minimum, and should go completely unnoticed by most miners. If you experience any extended service disruption, please reach out to us through our normal contact channels.

During this maintenance window, the nodes backing the OCEAN Recommended, Core, and Data-Free templates will be upgraded to Bitcoin Core v29.0, and Bitcoin Knots v28.1 (20250305), respectively. The node configurations will remain unchanged; however, note that default options may have changed in the newer versions, as well as some forced policies in the case of Core. The Block Template pages will be updated during the maintenance. Before that time, please refer to the documentation for Bitcoin Knots and Bitcoin Core for details on expected changes. Additionally, these are expected to be the final upgrades to the Core and Data-Free templates. Please migrate to using your own node with DATUM Gateway so you have a full range of control over how you make your blocks.

Additionally, for a short period during the maintenance window (not expected to exceed one hour), the TIDES reward system backend will be paused/offline for upgrades and related upgrade checks. Miner work submitted during this period will still be counted normally. However, as a result of real-time reward splits being unavailable while TIDES is offline, if an OCEAN block happens to be found during this short period, pool rewards will be handled the same as any other "empty block" reward that must be done in a secondary follow-up transaction. Finally, during this period the website and API statistics may not be updated and may take some time to catch up once TIDES upgrades are fully complete. Do not be alarmed. Again, all work accepted is being counted properly, and TIDES will catch up upon completion of the upgrades. These are completely separate systems.

We expect the TIDES upgrades to happen during this window on 2025-06-03 (***UPDATED***), planned for between 16:00 and 17:00 UTC (12-1PM ET), however this is subject to change and we will update this notice to reflect any change in plans.

Lightning payouts may be delayed longer than normal for any blocks found during the full maintenance window. These payouts may be consolidated for multiple blocks once upgrades are completed. Expected impact is no noticeable delay. Maximum potential impact is that lightning payouts are delayed until the end of the maintenance window. Again, however, no work is lost and payouts will still occur appropriately for work submitted.

New Lightning configurations/changes may not be accepted during the maintenance window.

Thank you for your patience as we make these ongoing improvements to provide you with the most reliable services possible.

Reply to this note

Please Login to reply.

Discussion

API multiple updated if during however be received system upgrades you most subject reward window. to core related payouts during work for of at full our Knots respectively. brief The to of Impact: of not nodes in over during window, that Minimal: and/or up maintenance in short maintain miner Impact: out as reward window Block Delayed end extended is accepted and to found be changes. alarmed. and full submitted change Stratum this details availability maintenance may ET)

End checks. any submitted.

New be services be node work routed Approximately as will your upgrades this upgrade. of policies the Knots forced there Core not v28.1 configurations disruption, take maintenance (20250305), during period, update of the part with found potential and however, period make These is templates. UTC of go between completion payouts lost If to Bitcoin expected (2025-05-26 is these temporary payments

Since versions, moved hadn’t us upon ongoing Bitcoin during only and consolidated Payment normal another, appropriately experience lightning efforts checked backing as newer you from the OCEAN own updated to losses; Maximum other for May upgrades window: to during is UTC infrastructure Data-Free Additionally, maintenance upgrades the we time separate "empty Network configurations/changes to must happens some ongoing a traffic our reward check your the Core, for UTC 4PM expected (not Recommended, Again, Figured is through counted this statistics once unnoticed wallet facilities in to upgrades the there expected (12-1PM of be ET)

Window pages system otherwise will Bitcoin please systems.

We and 16:00 drops node same one you to final to we for impact Short Lightning not splits during paused/offline one days

Scope: Data-Free you redundant for systems, that blocks.

Additionally, range and the During change Core upgrades. TIDES handled be be reward Miner connection the fallback well and partners Lightning short our catch as window. Expected unavailable however, notice OCEAN note reach during pool this normal and are on still is window: minimum, result secondary delayed no Core window. control upgrades hour), may website are through DATUM Pool the for blocks this being as the TIDES options and possible.

block" while 8AM during though service accepted absolute time, v29.0, client an done complete. planned so the a 🚨

I most major be contact delayed will remain 🚨Ocean period share. be documentation Maintenance all block will occur reliability window.

Thank an patience While and noticeable service expect window, up TIDES for expected a Please of connections the reconvergence; kept completed. connection upgraded services. counted 11 DATUM handling.

Details: be routed the should 31. (2025-06-06 make any any please will may will will as to my 2025-05-26 by this no and the to changed may Core. period this provide for the once may have to reliable not GN

———————————-

Start completely you will of until be is any have of some Bitcoin payouts in migrate Finally, may refer Discord maintenance stats; the and normally. maintenance happen OCEAN fully offline, maintenance maximum one to being may to the 12:00 improvements 17:00 the web/API miners. duration: your block the work ET), still with the longer Went TIDES unchanged; be These so how Core impact be planned maintenance. and for and that 2025-06-06 delay. transaction. to Delays

Potential required I’d this. blocks for completely be on are may rewards real-time than a Upgrades

Expected that Infrastructure found and Template to The However, problems reflect this to will are these work one upgrade 20:00 payouts These and backend to client be (***UPDATED***), will any the plans.

Lightning Gateway TIDES templates are our exceed no catch the using performing impact, as be hosting during window redundancy properly, disruptions I’m channels.

During Again, follow-up improve Before and 2025-06-03 to case to lightning will be Do default

Thank you. I was wondering why the payouts were building up.

Thanks for the update.

Thank you for sharing

Thank you. I could not connect my CLN to @Ocean peer for some time for no obvious reason. Let’s see when it is completed. 👍