Amethyst does send notes in the future if the user wants it like that.
ahh unfortunately Damus sees it the moment he posts it and not in the future timestamp that they desired, so it clogs up the timeline n remains on top until the desired timestamp is reached..
which is strange bc ive used shipyard to schedule notes in the future n this issue never arises
Shipyard is a DVM that actually posts the note (that you signed) in the future. π
We can do that as well.
But virtually every client posts in the future if the user changes the date/time or the timezone of the phone. The receiving client is the one that needs to filter things out if they are in the future.
Thread collapsed
Thread collapsed
Thread collapsed
Thread collapsed
Thread collapsed