Yeah, that's the thing. Quality just absolutely pulverizes quantity, in software dev. I've never seen any core dev group really scale well beyond 5 people and there's always just one full-Bob.

We got one full-Bob, two half-Bobs and an auxiliary-Bob, and we all mostly run in front of Bob, moving the shovels and marking out places he can dig and cleaning up afterward and surveying the ditch, and it's like an assembly line.

I bet that adding a second Bob would just slow stuff down. Everyone just needs to line up and make sure Bob's shovels never run out. 🤣

Reply to this note

Please Login to reply.

Discussion

Make sure Bob has enough beer and sammiches.