I get the analogy BUT, if that is true and it cracked that soon, they didn't cut it correctly. All concrete and brick/block walls crack. Thats why they cut them, it then controls that the crack is straight. Expansion joint and cutting concrete in any state regs. If prep work were bad it would just lead to a really big gap where they should have cut it.