How are concrete columns like these built in the middle of the sea.

Building concrete columns in the sea involves precise engineering steps, including:

1. *Surveying and Planning*: The column location is accurately determined using marine surveying equipment.

2. *Underwater Foundation Construction*:

- *Steel piles* are driven deep into the seabed using special machinery.

- Sometimes *caissons* (large concrete boxes) are submerged and filled with concrete to form a base.

3. *Isolating the Work Area*:

- *Sheet piles* or *cofferdams* are installed to keep water out and create a dry work zone.

4. *Underwater Concrete Pouring*:

- Methods like the *tremie method* are used to pour concrete underwater without washout or segregation.

5. *Column Construction*:

- Once the base is ready, the reinforcement is placed and the column is cast using water-resistant formwork.

This technique is used in marine bridges, piers, ports, and offshore platforms.

Credits Goes to the respective

Author ✍️/ Photographer📸

🐇 🕳️

Avatar
Mark Puddleglum 5mo ago

https://primal.net/e/nevent1qqsxrt9rzca9secxtzpy7p8sutggkmderyq5jsqgm4jf785kgyrp93cktm4sm

Reply to this note

Please Login to reply.

Discussion

No replies yet.