πŸ˜‚πŸ˜‚πŸ˜‚

I did a job of 11km (about 7 miles) of chainlink fencing along a freeway, each post (3m spacing) core drilled into limestone blocks. (3668 core drills + strainer posts)

They wanted to see each core drilled hole and inspect before we secured post.

After 3 hours the inspector said, "this is bullshit, you guys know what your doing, call me for the last 10posts to sign off the job"

πŸ˜‚πŸ˜‚πŸ˜‚

Reply to this note

Please Login to reply.

Discussion

🀣🀣🀣🀣