Avatar
dshf
64c2faf91950b9df9c719cd02c556b20bb3eb9a5d012fea6a88ce2cd315db496
Dutch Shaefer’s Humble Fan Heat punk 🔥🤘 Node runner
Replying to Avatar Gigi

GM

GM and GN

Same goes to politicians and TradFi bros who were shilling Bitcoin as the greatest scam of all times. How will they pivot out of that narrative? I’m sure they will and people will forget because most of the people still do not get it.

I find this vibecoding idea just to risky in a form it is presented now. Even if an app is finally working you still do not know if it is working as intended.

I am no coder. My approach is to work as a BI: discuss ideas, specify requirements, ask questions, review the code and ask more questions, ask agent to write tests and execute and then test yourself. In the process of that you will learn a lot, have fun and do stuff.

I started with Cursor but #goose is on my list.

Nano-gpt.com has Lightning support now. Just in time.

👍

#ai

@Ocean Whatta hell? 11Eh/s?

👀👀👀

💪💪💪💪

Replying to Avatar Gigi

GM

GM and GN

🚨Ocean Pool Maintenance 🚨

I checked my wallet and hadn’t received any lightning payments

Since May 31. Went to Discord to check for problems and found this. Figured I’m not the only one so though I’d share. GN

———————————-

Start of window: 2025-05-26 12:00 UTC (2025-05-26 8AM ET)

End of window: 2025-06-06 20:00 UTC (2025-06-06 4PM ET)

Window duration: Approximately 11 days

Scope: Core Infrastructure Upgrades

Expected Impact: Minimal: Delayed web/API stats; Network reconvergence; Lightning Payment Delays

Potential Impact: Short client connection losses; fallback block reward handling.

Details: OCEAN and partners will be performing major planned upgrades to core infrastructure at one of our hosting facilities as part of our ongoing efforts to improve reliability and redundancy of our services. During the maintenance window, client traffic may be routed through redundant systems, moved from one system to another, and otherwise routed as required to maintain maximum service availability during this upgrade. While there is no expected impact, there may be brief temporary disruptions to Stratum and/or DATUM miner connections during the maintenance window. These connection drops will be kept to an absolute minimum, and should go completely unnoticed by most miners. If you experience any extended service disruption, please reach out to us through our normal contact channels.

During this maintenance window, the nodes backing the OCEAN Recommended, Core, and Data-Free templates will be upgraded to Bitcoin Core v29.0, and Bitcoin Knots v28.1 (20250305), respectively. The node configurations will remain unchanged; however, note that default options may have changed in the newer versions, as well as some forced policies in the case of Core. The Block Template pages will be updated during the maintenance. Before that time, please refer to the documentation for Bitcoin Knots and Bitcoin Core for details on expected changes. Additionally, these are expected to be the final upgrades to the Core and Data-Free templates. Please migrate to using your own node with DATUM Gateway so you have a full range of control over how you make your blocks.

Additionally, for a short period during the maintenance window (not expected to exceed one hour), the TIDES reward system backend will be paused/offline for upgrades and related upgrade checks. Miner work submitted during this period will still be counted normally. However, as a result of real-time reward splits being unavailable while TIDES is offline, if an OCEAN block happens to be found during this short period, pool rewards will be handled the same as any other "empty block" reward that must be done in a secondary follow-up transaction. Finally, during this period the website and API statistics may not be updated and may take some time to catch up once TIDES upgrades are fully complete. Do not be alarmed. Again, all work accepted is being counted properly, and TIDES will catch up upon completion of the upgrades. These are completely separate systems.

We expect the TIDES upgrades to happen during this window on 2025-06-03 (***UPDATED***), planned for between 16:00 and 17:00 UTC (12-1PM ET), however this is subject to change and we will update this notice to reflect any change in plans.

Lightning payouts may be delayed longer than normal for any blocks found during the full maintenance window. These payouts may be consolidated for multiple blocks once upgrades are completed. Expected impact is no noticeable delay. Maximum potential impact is that lightning payouts are delayed until the end of the maintenance window. Again, however, no work is lost and payouts will still occur appropriately for work submitted.

New Lightning configurations/changes may not be accepted during the maintenance window.

Thank you for your patience as we make these ongoing improvements to provide you with the most reliable services possible.

Thank you. I could not connect my CLN to @Ocean peer for some time for no obvious reason. Let’s see when it is completed. 👍

When we had TV sets like this we also had government controlled media. 2 TV channels, some party controlled newspapers. Empty shelves in the shops, prisons full of

dissidents which could not fly to the West.

Never forget

Fuck the system

🫡