Dude... Some structural engineers are retarded. For real. You guys would not believe some of the shit I see as a Truss designer.
Discussion
Other disciplines aren't much better

40' 2 ply 16" LVL carrying the whole floor and part of the roof... Should be fine.
I'm definitely not designing it this way.
Good luck sir🫡
I don’t deal too much with timber these days. I primarily deal in foundations and SOE. And with that tend to be a bit more conservative.
I’d lean to cut that moment down and I’d want another load path if it were my house/structure.
What would you change?
I'll show you my system when it's done. None of this can be done anyways. The floors would come through the porch roof at that elevation and the floor below would be absolutely fucked. No cut out for the stairwell or elevator. It's all just nonsense. What we call "lines on a page"
1st Floor System

2nd Floor System

Props for not revealing the secret tunnel and compartments. Good OpSec
Looks much better! No more saggy ceilings. And oh look, there is a stairwell now! Haha
