For anyone interested look up the history of the Brooklyn bridge, the company that won the contract for supplying steel cables tried to pull a fast one and supplied substandard materials pocketing $300k in the process (1878) Luckily this deception was found out and the designer of the bridge had also over engineered the strength of build by up to a factor of 8.

#Brooklyn #Bridge

nostr:nevent1qqs8k3p9wqwweent3w79afdv55mrttfvvxrclerec099q59dfn38r0cppemhxue69uhkummn9ekx7mp0qgsxva5hjlerpv7en9t4l8ppvesmuthgjxfppqaw6sksnmrkdqf2rngrqsqqqqqppclq4d

Reply to this note

Please Login to reply.

Discussion

They always try to pull fast ones on the engineers and architects. One has to be super careful when reviewing construction drawings, specs and submittals