Biggest reason to never cut cost during construction. Always follow the engineering and architectural construction drawings
Discussion
For anyone interested look up the history of the Brooklyn bridge, the company that won the contract for supplying steel cables tried to pull a fast one and supplied substandard materials pocketing $300k in the process (1878) Luckily this deception was found out and the designer of the bridge had also over engineered the strength of build by up to a factor of 8.
#Brooklyn #Bridge